Portfolio

Less talk. More steel.

Aerial view of Intersect Power’s Oberon Battery Energy Storage System (BESS) data center showing modular white battery units arranged in rows on a prepared desert site.

A decade of visible, proven execution.

Our track record of building world class energy technology combined with our business model innovation speaks for itself with billions in industrial-scale clean infrastructure operating or under construction. We build decisively and operate with discipline. Our small, focused team and vertically integrated platform gives us end-to-end control from greenfield to delivery, site design to system commissioning. 

Our projects

Location
Status
  • Aerial view of the Oberon Solar and Battery Energy Storage System (BESS) project in Riverside County, California, operated by Intersect
    Location
    Riverside County, CA
    Capacity
    684 MW PV + 1 GWh BESS
    Status
    Operating
  • Engineer walking through the Lumina Substation, part of the Lumina project operated by Intersect.
    Location
    Scurry Country, TX
    Capacity
    828 MW PV + 640 MWh BESS
    Status
    Operating
  • High-voltage equipment and transmission structures at the Athos 3 Substation, part of the Athos 3 project by Intersect.
    Location
    Riverside County, CA
    Capacity
    310 MW PV + 448 MWh BESS
    Status
    Operating
  • Electrical infrastructure and transmission equipment at the Radian Substation, part of the Radian project by Intersect.
    Location
    Brown County, TX
    Capacity
    415 MW PV + 320 MWh BESS
    Status
    Operating
  • Intersect technician in safety gear performing electrical work at the Radian project site.

    Quantum

    Location
    Haskell County, TX
    Capacity
    840 MW PV + 1.3 GWh BESS
    Status
    In Construction
  • High-voltage transmission structure at Intersect Easley project site, set against a clear sky and desert landscape.

    Easley

    Location
    Riverside County, CA
    Capacity
    406 MW PV + 1.4 GWh BESS
    Status
    In Construction
  • Steel pile foundations and mounting structures at Intersect Aramis project site during early construction.

    Aramis

    Location
    Alameda County, CA
    Capacity
    105 MW PV + 400 MWh BESS
    Status
    In Construction
  • Inverter units at Intersect project site, part of the system converting solar energy into grid-ready power.

    Darden

    Location
    Fresno County, CA
    Capacity
    1.6 GW PV + 4.6 GWh BESS
    Status
    In Development
  • Aerial view of electrical substation equipment at Intersect Meitner project site, showing transformers and steel structures arranged on a desert site.

    Meitner

    Location
    Gray County, TX
    Capacity
    700 MW PV + 500 MW Wind
    Status
    In Development
  • Intersect construction worker using a power tool to cut steel piles during foundation work at the Aramis project site.

    Roman

    Location
    Deaf Smith County, TX
    Capacity
    462 MW PV + 670 MW Wind
    Status
    In Development
There are no projects that match these filters.

Bring us the challenge.